Kapur A, Potters L. Six sigma tools for a patient safety-oriented, quality-checklist driven radiation medicine department.
Pract Radiat Oncol 2011;
2:86-96. [PMID:
24674084 DOI:
10.1016/j.prro.2011.06.010]
[Citation(s) in RCA: 31] [Impact Index Per Article: 2.4] [Reference Citation Analysis] [Abstract] [Track Full Text] [Journal Information] [Subscribe] [Scholar Register] [Received: 04/25/2011] [Revised: 06/03/2011] [Accepted: 06/13/2011] [Indexed: 10/17/2022]
Abstract
INTRODUCTION
The purpose of this work was to develop and implement six sigma practices toward the enhancement of patient safety in an electronic, quality checklist-driven, multicenter, paperless radiation medicine department.
METHODS AND MATERIALS
A quality checklist process map (QPM), stratified into consultation through treatment-completion stages was incorporated into an oncology information systems platform. A cross-functional quality management team conducted quality-function-deployment and define-measure-analyze-improve-control (DMAIC) six sigma exercises with a focus on patient safety. QPM procedures were Pareto-sorted in order of decreasing patient safety risk with failure mode and effects analysis (FMEA). Quantitative metrics for a grouped set of highest risk procedures were established. These included procedural delays, associated standard deviations and six sigma Z scores. Baseline performance of the QPM was established over the previous year of usage. Data-driven analysis led to simplification, standardization, and refinement of the QPM with standard deviation, slip-day reduction, and Z-score enhancement goals. A no-fly policy (NFP) for patient safety was introduced at the improve-control DMAIC phase, with a process map interlock imposed on treatment initiation in the event of FMEA-identified high-risk tasks being delayed or not completed. The NFP was introduced in a pilot phase with specific stopping rules and the same metrics used for performance assessments. A custom root-cause analysis database was deployed to monitor patient safety events.
RESULTS
Relative to the baseline period, average slip days and standard deviations for the risk-enhanced QPM procedures improved by over threefold factors in the NFP period. The Z scores improved by approximately 20%. A trend for proactive delays instead of reactive hard stops was observed with no adverse effects of the NFP. The number of computed potential no-fly delays per month dropped from 60 to 20 over a total of 520 cases. The fraction of computed potential no-fly cases that were delayed in NFP compliance rose from 28% to 45%. Proactive delays rose to 80% of all delayed cases. For potential no-fly cases, event reporting rose from 18% to 50%, while for actually delayed cases, event reporting rose from 65% to 100%.
CONCLUSIONS
With complex technologies, resource-compromised staff, and pressures to hasten treatment initiation, the use of the six sigma driven process interlocks may mitigate potential patient safety risks as demonstrated in this study.