• Reference Citation Analysis
  • v
  • v
  • Find an Article
Find an Article PDF (4692550)   Today's Articles (6645)
For: Shan S, Hu Z, Liu Z, Shi J, Wang L, Bi Z. An adaptive genetic algorithm for demand-driven and resource-constrained project scheduling in aircraft assembly. Inf Technol Manag 2015. [DOI: 10.1007/s10799-015-0223-7] [Citation(s) in RCA: 9] [Impact Index Per Article: 0.9] [Reference Citation Analysis] [What about the content of this article? (0)] [Track Full Text] [Journal Information] [Subscribe] [Scholar Register] [Indexed: 10/23/2022]
Number Cited by Other Article(s)
1
Review of Optimization Dynamically Applied in the Construction and the Application Potential of ICT. SUSTAINABILITY 2021. [DOI: 10.3390/su13105478] [Citation(s) in RCA: 2] [Impact Index Per Article: 0.5] [Reference Citation Analysis] [Abstract] [Track Full Text] [Subscribe] [Scholar Register] [Indexed: 11/16/2022]
PrevPage 1 of 1 1Next
© 2004-2025 Baishideng Publishing Group Inc. All rights reserved. 7041 Koll Center Parkway, Suite 160, Pleasanton, CA 94566, USA