Zhang Y, Zhang W, Zhang X, Zhang B. Step by step and combined supporting technique with allowable deformation + limiting shape for soft rock roadway.
Heliyon 2024;
10:e32200. [PMID:
38912461 PMCID:
PMC11190589 DOI:
10.1016/j.heliyon.2024.e32200]
[Citation(s) in RCA: 0] [Impact Index Per Article: 0] [Reference Citation Analysis] [Abstract] [Key Words] [Track Full Text] [Download PDF] [Figures] [Journal Information] [Subscribe] [Scholar Register] [Received: 01/27/2023] [Revised: 11/26/2023] [Accepted: 05/29/2024] [Indexed: 06/25/2024] Open
Abstract
Aiming at the difficult problems of the large deformation in weakly cemented soft rock roadways, the reasons of large deformation are analyzed for roadways in Hongqingliang coal mine. On this basis, the principle of step by step combined support technology based on allowable deformation + limiting shape for weakly cemented soft rock roadway is proposed, and the optimal support parameters of step by step combined technology are determined by FLAC3D. Step by step combined support technology includes the primary support of anchor bolt + anchor cable + initial shotcrete and the secondary support of U-shaped steel shed + filling flexible material behind shed + control of key parts. The comparative analysis on the site shows that the deformation rate and final deformation amount of the surrounding rock after the step by step combined support are less than those of the primary support, and the deformation of the surrounding rock can be controlled effectively after the secondary support is added. Step by step combined support is superior to the traditional bolt + anchor cable combined repair in terms of economy and efficiency. The optimal construction period of each working procedure of the step by step combined technology is 28 days after the completion of the first support, and the step by step combined support based on allowable deformation + limiting shape is an effective way to control the surrounding rock of soft rock roadway.
Collapse