1
|
|
2
|
Noguchi Y, Saito M, Maruyama T, Takeda N. Design progress of ITER blanket remote handling system towards manufacturing. FUSION ENGINEERING AND DESIGN 2018. [DOI: 10.1016/j.fusengdes.2018.03.068] [Citation(s) in RCA: 2] [Impact Index Per Article: 0.3] [Reference Citation Analysis] [Track Full Text] [Subscribe] [Scholar Register] [Indexed: 10/17/2022]
|
3
|
Utoh H, Hiwatari R, Tobita K, Someya Y, Aoki A, Sakamoto Y, Asakura N. Technological assessment between vertical and horizontal remote maintenance schemes for DEMO reactor. FUSION ENGINEERING AND DESIGN 2017. [DOI: 10.1016/j.fusengdes.2017.03.036] [Citation(s) in RCA: 4] [Impact Index Per Article: 0.6] [Reference Citation Analysis] [Track Full Text] [Subscribe] [Scholar Register] [Indexed: 10/19/2022]
|
4
|
Someya Y, Utoh H, Hiwatari R, Tanigawa H, Tobita K. Shutdown dose-rate assessment during the replacement of in-vessel components for a fusion DEMO reactor. FUSION ENGINEERING AND DESIGN 2017. [DOI: 10.1016/j.fusengdes.2017.02.108] [Citation(s) in RCA: 6] [Impact Index Per Article: 0.9] [Reference Citation Analysis] [Track Full Text] [Subscribe] [Scholar Register] [Indexed: 11/29/2022]
|
5
|
Noguchi Y, Maruyama T, Ueno K, Komai M, Takeda N, Kakudate S. Impact hammer test of ITER blanket remote handling system. FUSION ENGINEERING AND DESIGN 2016. [DOI: 10.1016/j.fusengdes.2015.12.040] [Citation(s) in RCA: 4] [Impact Index Per Article: 0.5] [Reference Citation Analysis] [Track Full Text] [Subscribe] [Scholar Register] [Indexed: 11/16/2022]
|
6
|
Robot vision system R&D for ITER blanket remote-handling system. FUSION ENGINEERING AND DESIGN 2014. [DOI: 10.1016/j.fusengdes.2014.01.004] [Citation(s) in RCA: 3] [Impact Index Per Article: 0.3] [Reference Citation Analysis] [Track Full Text] [Subscribe] [Scholar Register] [Indexed: 10/25/2022]
|
7
|
Takeda N, Aburadani A, Tanigawa H, Shigematsu S, Kozaka H, Murakami S, Kakudate S, Nakahira M, Tesini A. Rail deployment operation test for ITER blanket handling system with positioning misalignment. FUSION ENGINEERING AND DESIGN 2013. [DOI: 10.1016/j.fusengdes.2013.02.086] [Citation(s) in RCA: 2] [Impact Index Per Article: 0.2] [Reference Citation Analysis] [Track Full Text] [Subscribe] [Scholar Register] [Indexed: 11/26/2022]
|
8
|
Aburadani A, Takeda N, Shigematsu S, Murakami S, Tanigawa H, Kakudate S, Nakahira M, Hamilton D, Tesini A. Performance evaluation on force control for ITER blanket installation. FUSION ENGINEERING AND DESIGN 2013. [DOI: 10.1016/j.fusengdes.2013.02.093] [Citation(s) in RCA: 2] [Impact Index Per Article: 0.2] [Reference Citation Analysis] [Track Full Text] [Subscribe] [Scholar Register] [Indexed: 11/30/2022]
|
9
|
Comparative study of laser and TIG welding for application to ITER blanket hydraulic connection. FUSION ENGINEERING AND DESIGN 2012. [DOI: 10.1016/j.fusengdes.2012.02.055] [Citation(s) in RCA: 13] [Impact Index Per Article: 1.1] [Reference Citation Analysis] [Track Full Text] [Subscribe] [Scholar Register] [Indexed: 11/19/2022]
|
10
|
R&D on major components of control system for ITER blanket maintenance equipment. FUSION ENGINEERING AND DESIGN 2010. [DOI: 10.1016/j.fusengdes.2010.02.037] [Citation(s) in RCA: 1] [Impact Index Per Article: 0.1] [Reference Citation Analysis] [Track Full Text] [Subscribe] [Scholar Register] [Indexed: 11/15/2022]
|
11
|
Takeda N, Kakudate S, Nakahira M, Matsumoto Y, Taguchi K, Kozaka H, Shibanuma K, Tesini A. Mock-up test on key components of ITER blanket remote handling system. FUSION ENGINEERING AND DESIGN 2009. [DOI: 10.1016/j.fusengdes.2009.02.009] [Citation(s) in RCA: 11] [Impact Index Per Article: 0.7] [Reference Citation Analysis] [Track Full Text] [Subscribe] [Scholar Register] [Indexed: 11/26/2022]
|