• Reference Citation Analysis
  • v
  • v
  • Find an Article
Find an Article PDF (4625220)   Today's Articles (1177)   Subscriber (49508)
For: LEE HAUL, ROSENBLATT MEIRJ. A Production and Maintenance Planning Model with Restoration Cost Dependent on Detection Delay. ACTA ACUST UNITED AC 1989. [DOI: 10.1080/07408178908966243] [Citation(s) in RCA: 84] [Impact Index Per Article: 2.4] [Reference Citation Analysis] [What about the content of this article? (0)] [Track Full Text] [Journal Information] [Subscribe] [Scholar Register] [Indexed: 10/23/2022]
Number Cited by Other Article(s)
1
Tseng ST. Optimal Preventive Maintenance Policy for Deteriorating Production Systems. ACTA ACUST UNITED AC 2016. [DOI: 10.1080/15458830.1996.11770713] [Citation(s) in RCA: 59] [Impact Index Per Article: 7.4] [Reference Citation Analysis] [Track Full Text] [Journal Information] [Subscribe] [Scholar Register] [Indexed: 10/21/2022]
2
Shah NH, Shukla KT. Optimal production schedule in declining market for an imperfect production system. INT J MACH LEARN CYB 2010. [DOI: 10.1007/s13042-010-0005-9] [Citation(s) in RCA: 6] [Impact Index Per Article: 0.4] [Reference Citation Analysis] [Track Full Text] [Journal Information] [Subscribe] [Scholar Register] [Indexed: 10/19/2022]
3
Chen CH. Optimum production run length and warranty period setting for the imperfect production system. JOURNAL OF STATISTICS & MANAGEMENT SYSTEMS 2008. [DOI: 10.1080/09720510.2008.10701305] [Citation(s) in RCA: 0] [Impact Index Per Article: 0] [Reference Citation Analysis] [Track Full Text] [Journal Information] [Subscribe] [Scholar Register] [Indexed: 10/26/2022]
4
Chen CH. The determination of economic production run length and manufacturing target by considering quality loss function. JOURNAL OF STATISTICS & MANAGEMENT SYSTEMS 2008. [DOI: 10.1080/09720510.2008.10701304] [Citation(s) in RCA: 1] [Impact Index Per Article: 0.1] [Reference Citation Analysis] [Track Full Text] [Journal Information] [Subscribe] [Scholar Register] [Indexed: 10/26/2022]
5
Wang CH, Chao MH, Huang IM. Capital investment in setup cost reduction for a lot-size, reorder point model. JOURNAL OF INFORMATION & OPTIMIZATION SCIENCES 2006. [DOI: 10.1080/02522667.2006.10699690] [Citation(s) in RCA: 1] [Impact Index Per Article: 0.1] [Reference Citation Analysis] [Track Full Text] [Journal Information] [Subscribe] [Scholar Register] [Indexed: 10/26/2022]
6
Wang CH. A production model with imperfect preventive maintenance. JOURNAL OF STATISTICS & MANAGEMENT SYSTEMS 2005. [DOI: 10.1080/09720510.2005.10701182] [Citation(s) in RCA: 0] [Impact Index Per Article: 0] [Reference Citation Analysis] [Track Full Text] [Journal Information] [Subscribe] [Scholar Register] [Indexed: 10/26/2022]
7
Wang CH, Yang DL, Wu TH, Kuo WH, Shih NH. Impact of inspection errors on the lot size problem. JOURNAL OF INFORMATION & OPTIMIZATION SCIENCES 2004. [DOI: 10.1080/02522667.2004.10699611] [Citation(s) in RCA: 3] [Impact Index Per Article: 0.2] [Reference Citation Analysis] [Track Full Text] [Journal Information] [Subscribe] [Scholar Register] [Indexed: 10/26/2022]
8
Wang WY. Integrated inspection strategy model with inspection errors and positive inspection time lengths. JOURNAL OF STATISTICS & MANAGEMENT SYSTEMS 2004. [DOI: 10.1080/09720510.2004.10701125] [Citation(s) in RCA: 0] [Impact Index Per Article: 0] [Reference Citation Analysis] [Track Full Text] [Journal Information] [Subscribe] [Scholar Register] [Indexed: 10/26/2022]
9
EMMONS HAMILTON, RABINOWITZ GAD. Inspection allocation for multistage deteriorating production systems. ACTA ACUST UNITED AC 2002. [DOI: 10.1080/07408170208928932] [Citation(s) in RCA: 12] [Impact Index Per Article: 0.5] [Reference Citation Analysis] [Track Full Text] [Journal Information] [Subscribe] [Scholar Register] [Indexed: 10/23/2022]
10
SLOAN THOMASW, SHANTHIKUMAR JGEORGE. Using in-line equipment condition and yield information for maintenance scheduling and dispatching in semiconductor wafer fabs. ACTA ACUST UNITED AC 2002. [DOI: 10.1080/07408170208928861] [Citation(s) in RCA: 15] [Impact Index Per Article: 0.7] [Reference Citation Analysis] [Track Full Text] [Journal Information] [Subscribe] [Scholar Register] [Indexed: 10/23/2022]
11
Huang B, Chiu H. The quality management of the imperfect production process under two monitoring policies. INTERNATIONAL JOURNAL OF QUALITY & RELIABILITY MANAGEMENT 1995. [DOI: 10.1108/02656719510084754] [Citation(s) in RCA: 10] [Impact Index Per Article: 0.3] [Reference Citation Analysis] [Track Full Text] [Subscribe] [Scholar Register] [Indexed: 11/17/2022]
PrevPage 1 of 1 1Next
© 2004-2024 Baishideng Publishing Group Inc. All rights reserved. 7041 Koll Center Parkway, Suite 160, Pleasanton, CA 94566, USA