1
|
Amadi AI. Towards methodological adventure in cost overrun research: linking process and product. INTERNATIONAL JOURNAL OF CONSTRUCTION MANAGEMENT 2021. [DOI: 10.1080/15623599.2021.1894632] [Citation(s) in RCA: 1] [Impact Index Per Article: 0.3] [Reference Citation Analysis] [Track Full Text] [Subscribe] [Scholar Register] [Indexed: 10/21/2022]
Affiliation(s)
- Alolote Ibim Amadi
- Department of Quantity Surveying, Rivers State University, Port Harcourt, Rivers State, Nigeria
| |
Collapse
|
2
|
Tavassolirizi M, Sarvari H, Chan DW, Olawumi TO. Factors affecting delays in rail transportation projects using Analytic Network Process: the case of Iran. INTERNATIONAL JOURNAL OF CONSTRUCTION MANAGEMENT 2020. [DOI: 10.1080/15623599.2020.1819946] [Citation(s) in RCA: 5] [Impact Index Per Article: 1.3] [Reference Citation Analysis] [Track Full Text] [Subscribe] [Scholar Register] [Indexed: 10/23/2022]
Affiliation(s)
- Mohsen Tavassolirizi
- Department of Civil Engineering, Isfahan (Khorasgan) Branch, Islamic Azad University, Isfahan, Iran
| | - Hadi Sarvari
- Department of Civil Engineering, Isfahan (Khorasgan) Branch, Islamic Azad University, Isfahan, Iran
| | - Daniel W.M. Chan
- Department of Building and Real Estate, The Hong Kong Polytechnic University, Hung Hom, Kowloon, Hong Kong, China
| | - Timothy O. Olawumi
- Department of Building and Real Estate, The Hong Kong Polytechnic University, Hung Hom, Kowloon, Hong Kong, China
| |
Collapse
|
3
|
Cost Overrun Causative Factors in Road Infrastructure Projects: A Frequency and Importance Analysis. APPLIED SCIENCES-BASEL 2020. [DOI: 10.3390/app10165506] [Citation(s) in RCA: 15] [Impact Index Per Article: 3.8] [Reference Citation Analysis] [Abstract] [Track Full Text] [Subscribe] [Scholar Register] [Indexed: 11/17/2022]
Abstract
Road infrastructure projects are essential for a country’s economic and social development. Due to the magnitude, the projects are associated with considerable economic investments that in the case of failure can seriously affect regions’ economies. Despite the importance, roads from different countries are affected by cost overruns, hence, it is essential to identify and analyze the causative factors to focus the search for mitigation solutions. There are several studies focused on the cost factors identification, however, studies are lacking that synthesize and analyze the frequency and importance with which the factors have been reported to obtain a phenomenon overview. Therefore, this paper focuses on analyzing the frequency and importance with which cost overrun factors are reported in road projects. The research method consisted of a systematic review compound of five principal stages: (1) question formulation; (2) searching of relevant documents; (3) document selection; (4) evidence collection, analysis and synthesis; and (5) results’ report. Thirty-eight cost overrun factors were identified and classified into 14 categories. According to the Influence Index, the five most important and frequent cost overrun factors were: (1) failures in design, (2) price variation of materials, (3) inadequate project planning, (4) project scope changes, and (5) design changes.
Collapse
|
4
|
Ghazal MM, Hammad A. Application of knowledge discovery in database (KDD) techniques in cost overrun of construction projects. INTERNATIONAL JOURNAL OF CONSTRUCTION MANAGEMENT 2020. [DOI: 10.1080/15623599.2020.1738205] [Citation(s) in RCA: 5] [Impact Index Per Article: 1.3] [Reference Citation Analysis] [Track Full Text] [Subscribe] [Scholar Register] [Indexed: 10/24/2022]
Affiliation(s)
- Mai Monir Ghazal
- Department of Industrial Engineering and Engineering Management, College of Engineering, University of Sharjah, Sharjah, United Arab Emirates
| | - Ahmed Hammad
- Department of Civil and Environmental Engineering, Donadeo Innovation Centre for Engineering, University of Alberta, Edmonton, Canada
| |
Collapse
|