Ferronato N, Fuentes Sirpa RC, Guisbert Lizarazu EG, Conti F, Torretta V. Construction and demolition waste recycling in developing cities: management and cost analysis. ENVIRONMENTAL SCIENCE AND POLLUTION RESEARCH INTERNATIONAL 2023; 30:24377-24397. [PMID: 36342611 PMCID: PMC9938826 DOI: 10.1007/s11356-022-23502-x] [Citation(s) in RCA: 0] [Impact Index Per Article: 0] [Reference Citation Analysis] [Abstract] [Key Words] [MESH Headings] [Grants] [Track Full Text] [Figures] [Subscribe] [Scholar Register] [Received: 01/19/2022] [Accepted: 10/04/2022] [Indexed: 06/16/2023]
Abstract
In Bolivia, construction and demolition waste (CDW) is unmanaged. The current research implemented a CDW flow analysis and a cost assessment in the city of La Paz, aiming to compare future recycling scenarios. Lack of data is challenging; therefore, a review of 31 international studies has been conducted. Results report that the waste generation rate (WGR) of concrete residential buildings can be of about 91.9-113.3 kg m-2 for construction and about 867.2-1064.8 kg m-2 for demolition. In addition, positive correlation was found in national WGR with number of inhabitants and the GDP. By these results, it was estimated that about 271,051-349,418 tonnes of CDW are potentially generated yearly in La Paz, about two times more than the CDW projected by local authorities. By the scenarios analysis, it was estimated that 56.1-71.1% of the inert aggregates can be recycled. The cost of the system is estimated between 7.8 and 31.1 USD tCDW-1, for a total annual cost (20 years horizon) of about 2.3-9 million USD y-1 depending on the management scenario. In the best scenario, an average fee of less than 1% of the current costs of a flat in La Paz can be required, potentially affordable for the local economy. The most attractive scenario involves the source separation of recyclable materials and the hybrid organization of stationary and mobile recycling facilities. Results show that a CDW management can be implemented in La Paz to foster a circular economy in developing cities.
Collapse
Affiliation(s)
- Navarro Ferronato
- Department of Theoretical and Applied Sciences (DiSTA), University of Insubria, Via G.B. Vico 46, 21100, Varese, Italy.
| | | | | | - Fabio Conti
- Department of Theoretical and Applied Sciences (DiSTA), University of Insubria, Via G.B. Vico 46, 21100, Varese, Italy
| | - Vincenzo Torretta
- Department of Theoretical and Applied Sciences (DiSTA), University of Insubria, Via G.B. Vico 46, 21100, Varese, Italy
| |
Collapse
|
2
|
Kim YC, Zhang YL, Park WJ, Cha GW, Kim JW, Hong WH. Analysis of Waste Generation Characteristics during New Apartment Construction-Considering the Construction Phase. INTERNATIONAL JOURNAL OF ENVIRONMENTAL RESEARCH AND PUBLIC HEALTH 2019; 16:ijerph16183485. [PMID: 31546765 PMCID: PMC6765970 DOI: 10.3390/ijerph16183485] [Citation(s) in RCA: 4] [Impact Index Per Article: 0.8] [Reference Citation Analysis] [Abstract] [Key Words] [MESH Headings] [Track Full Text] [Download PDF] [Figures] [Subscribe] [Scholar Register] [Received: 08/14/2019] [Revised: 09/10/2019] [Accepted: 09/13/2019] [Indexed: 11/16/2022]
Abstract
The waste generation rate (WGR) is used to predict the generation of construction and demolition waste (C&DW) and has become a prevalent tool for efficient waste management systems. Many studies have focused on deriving the WGR, but most focused on demolition waste rather than construction waste (CW). Moreover, previous studies have used theoretical databases and thus were limited in showing changes in the generated CW during the construction period of actual sites. In this study, CW data were collected for recently completed apartment building sites through direct measurement, and the WGR was calculated by CW type for the construction period. The CW generation characteristics by type were analyzed, and the results were compared with those of previous studies. In this study, CW was classified into six types: Waste concrete, waste asphalt concrete, waste wood, waste synthetic resin, waste board, and mixed waste. The amount of CW generated was lowest at the beginning of the construction period. It slowly increased over time and then decreased again at the end. In particular, waste concrete and mixed waste were generated throughout the construction period, while other CWs were generated in the middle of the construction period or towards the end. The research method and results of this study are significant in that the construction period was considered, which has been neglected in previous studies on the WGR. These findings are expected to contribute to the development of efficient CW management systems.
Collapse
Affiliation(s)
- Young-Chan Kim
- Innovative Durable Building and Infrastructure Research Center, Hanyang University, 55 Hanyangdaehak-ro, Sangnok-gu, Ansan 426-791, Korea.
| | - Yuan-Long Zhang
- School of Architecture, Civil, Environmental and Energy Engineering, Kyungpook National University, 80 Daehak-ro, Buk-gu, Daegu 41566, Korea.
| | - Won-Jun Park
- Department of Civil Engineering, Kangwon National University, 346, Jungang-ro, Samcheok-si, Gangwon-do 25913, Korea.
| | - Gi-Wook Cha
- Department of Architectural Engineering, Jeju National University, 102 Jejudaehak-ro, Jeju-si, Jeju Special Self-Governing Province 63243, Korea.
| | - Jung-Wan Kim
- POSCO E&C, Building Works Division, Building Technology Group 241, Incheon tower-daero, Yeonsu-gu, Incheon 22009, Korea.
| | - Won-Hwa Hong
- School of Architecture, Civil, Environmental and Energy Engineering, Kyungpook National University, 80 Daehak-ro, Buk-gu, Daegu 41566, Korea.
| |
Collapse
|
3
|
Vilventhan A, Ram VG, Sugumaran S. Value stream mapping for identification and assessment of material waste in construction: A case study. WASTE MANAGEMENT & RESEARCH : THE JOURNAL OF THE INTERNATIONAL SOLID WASTES AND PUBLIC CLEANSING ASSOCIATION, ISWA 2019; 37:815-825. [PMID: 31213142 DOI: 10.1177/0734242x19855429] [Citation(s) in RCA: 8] [Impact Index Per Article: 1.6] [Reference Citation Analysis] [Abstract] [Key Words] [MESH Headings] [Track Full Text] [Subscribe] [Scholar Register] [Indexed: 06/09/2023]
Abstract
Construction sites are plagued with numerous problems, such as improper planning and management, high amounts of waste generation and low awareness of waste reduction. Construction and demolition waste literature provides several best practises and prescriptive strategies that help minimise waste during construction. However, it lacks in the systematic identification and minimisation approach of all possibilities of waste. Therefore, studies focusing on principles and tools that help systematically analyse the inefficiencies of on-site processes leading to waste generation and philosophies addressing waste minimisation are necessary. As eliminating waste is one of the key lean principles, this article discusses the need and importance of integrating the lean construction with the construction and demolition waste management. This article aims to estimate and assess the causes of waste generation in a high-rise building construction through a case study in Chennai city (India) using value stream mapping, a key lean construction tool. Onsite monitoring and measurement were performed to quantify the amount of waste generated. A waste generation rate of 66.26 kg m-2 was identified, of which concrete, cement mortar and brick waste represented almost 90% of the total construction waste. Direct observation and interviews of site personnel were conducted to understand the causes of waste generation. A strategic framework has been proposed to improve construction and demolition waste minimisation depicting the synergy of combining lean construction principles with construction and demolition waste management strategies. The proposed framework helps in the systematic identification, assessment and minimisation of on-site construction waste generation.
Collapse
Affiliation(s)
| | - V G Ram
- 2 Indian Institute of Technology Madras, Chennai, India
| | - S Sugumaran
- 3 Construction Engineering and Management, SRM University, Kattankulathur, India
| |
Collapse
|
4
|
Getting Environmental Information from Construction Cost Databases: Applications in Brazilian Courses and Environmental Assessment. SUSTAINABILITY 2019. [DOI: 10.3390/su11010187] [Citation(s) in RCA: 3] [Impact Index Per Article: 0.6] [Reference Citation Analysis] [Abstract] [Track Full Text] [Subscribe] [Scholar Register] [Indexed: 11/16/2022]
Abstract
The traditional decision-making process in construction is still driven by factors such as cost and time, not adequately addressing indicators to control their environmental impacts. So, how to improve environmental communication to incorporate sustainable building practices. The incorporation of environmental indicators may enlarge the scope of construction management tools. In the case of cost databases, widely used in the construction sector, this action can contribute to the communication and dissemination of environmental practices. This paper mapped 24 indicators from construction cost databases to assess their ability to communicate and disseminate environmental information. The research comprised: (a) a review of the use of cost bases in the environmental study, (b) identification of the most cited bases in 27 Brazilian civil engineering courses, and (c) analysis of the selected databases through of the assessment matrix, it crosses cost data versus environmental information. CYPE, TCPO, and ORSE presented performance medium, and higher results than SINAPI, BDCCM, and BCCA. The tools presented low control over environmental information, such as water and energy consumption, machine circulation and pollution generation. However, it has been observed that when adding environmental indicators, these tools can contribute significantly to disseminate good practices in its wide user base.
Collapse
|
5
|
A Quantitative Method for Prediction of Environmental Aspects in Construction Sites of Residential Buildings. SUSTAINABILITY 2018. [DOI: 10.3390/su10061870] [Citation(s) in RCA: 8] [Impact Index Per Article: 1.3] [Reference Citation Analysis] [Track Full Text] [Subscribe] [Scholar Register] [Indexed: 11/16/2022]
|
6
|
Paz DHFD, Lafayette KPV, Sobral MDC. GIS-based planning system for managing the flow of construction and demolition waste in Brazil. WASTE MANAGEMENT & RESEARCH : THE JOURNAL OF THE INTERNATIONAL SOLID WASTES AND PUBLIC CLEANSING ASSOCIATION, ISWA 2018; 36:541-549. [PMID: 29776320 DOI: 10.1177/0734242x18772096] [Citation(s) in RCA: 1] [Impact Index Per Article: 0.2] [Reference Citation Analysis] [Abstract] [Key Words] [MESH Headings] [Track Full Text] [Subscribe] [Scholar Register] [Indexed: 06/08/2023]
Abstract
The objective of this article was to plan a network for municipal management of construction and demolition waste in Brazil with the assistance of a geographic information system, using the city of Recife as a case study. The methodology was carried out in three stages. The first was to map the illegal construction and demolition of waste disposal points across Recife and classify the waste according to its recyclability. In sequence, a method for indicating suitable areas for installation of voluntary delivery points, for small waste generators, are presented. Finally, a method for indicating suitable areas for the installation of trans-shipment and waste sorting areas, developed for large generators, is presented. The results show that a geographic information system is an essential tool in the planning of municipal construction and demolition waste management, in order to facilitate the spatial analysis and control the generation, sorting, collection, transportation, and final destination of construction and demolition waste, increasing the rate of recovery and recycling of materials.
Collapse
|
7
|
Ram VG, Kalidindi SN. Estimation of construction and demolition waste using waste generation rates in Chennai, India. WASTE MANAGEMENT & RESEARCH : THE JOURNAL OF THE INTERNATIONAL SOLID WASTES AND PUBLIC CLEANSING ASSOCIATION, ISWA 2017; 35:610-617. [PMID: 28566032 DOI: 10.1177/0734242x17693297] [Citation(s) in RCA: 18] [Impact Index Per Article: 2.6] [Reference Citation Analysis] [Abstract] [Key Words] [MESH Headings] [Track Full Text] [Subscribe] [Scholar Register] [Indexed: 06/07/2023]
Abstract
A large amount of construction and demolition waste is being generated owing to rapid urbanisation in Indian cities. A reliable estimate of construction and demolition waste generation is essential to create awareness about this stream of solid waste among the government bodies in India. However, the required data to estimate construction and demolition waste generation in India are unavailable or not explicitly documented. This study proposed an approach to estimate construction and demolition waste generation using waste generation rates and demonstrated it by estimating construction and demolition waste generation in Chennai city. The demolition waste generation rates of primary materials were determined through regression analysis using waste generation data from 45 case studies. Materials, such as wood, electrical wires, doors, windows and reinforcement steel, were found to be salvaged and sold on the secondary market. Concrete and masonry debris were dumped in either landfills or unauthorised places. The total quantity of construction and demolition debris generated in Chennai city in 2013 was estimated to be 1.14 million tonnes. The proportion of masonry debris was found to be 76% of the total quantity of demolition debris. Construction and demolition debris forms about 36% of the total solid waste generated in Chennai city. A gross underestimation of construction and demolition waste generation in some earlier studies in India has also been shown. The methodology proposed could be utilised by government bodies, policymakers and researchers to generate reliable estimates of construction and demolition waste in other developing countries facing similar challenges of limited data availability.
Collapse
Affiliation(s)
- V G Ram
- Department of Civil Engineering, Indian Institute of Technology Madras, Chennai, India
| | | |
Collapse
|