• Reference Citation Analysis
  • v
  • v
  • Find an Article
Find an Article PDF (4618910)   Today's Articles (757)   Subscriber (49402)
For: Zhao L, Liu Z, Mbachu J. Development of Intelligent Prefabs Using IoT Technology to Improve the Performance of Prefabricated Construction Projects. Sensors (Basel) 2019;19:s19194131. [PMID: 31554246 PMCID: PMC6806325 DOI: 10.3390/s19194131] [Citation(s) in RCA: 25] [Impact Index Per Article: 5.0] [Reference Citation Analysis] [What about the content of this article? (0)] [Track Full Text] [Download PDF] [Figures] [Subscribe] [Scholar Register] [Received: 08/01/2019] [Revised: 09/10/2019] [Accepted: 09/16/2019] [Indexed: 11/29/2022]
Number Cited by Other Article(s)
1
Li CZ, Li S, Ya Y, Tam VW. Digital inspection techniques of modular integrated construction. Heliyon 2023;9:e21399. [PMID: 37954356 PMCID: PMC10632720 DOI: 10.1016/j.heliyon.2023.e21399] [Citation(s) in RCA: 0] [Impact Index Per Article: 0] [Reference Citation Analysis] [Abstract] [Key Words] [Track Full Text] [Download PDF] [Figures] [Journal Information] [Subscribe] [Scholar Register] [Received: 09/22/2023] [Accepted: 10/20/2023] [Indexed: 11/14/2023]  Open
2
Ragnoli M, Colaiuda D, Leoni A, Ferri G, Barile G, Rotilio M, Laurini E, De Berardinis P, Stornelli V. A LoRaWAN Multi-Technological Architecture for Construction Site Monitoring. SENSORS (BASEL, SWITZERLAND) 2022;22:s22228685. [PMID: 36433281 PMCID: PMC9696629 DOI: 10.3390/s22228685] [Citation(s) in RCA: 1] [Impact Index Per Article: 0.5] [Reference Citation Analysis] [Abstract] [Key Words] [MESH Headings] [Track Full Text] [Subscribe] [Scholar Register] [Received: 10/10/2022] [Revised: 11/07/2022] [Accepted: 11/07/2022] [Indexed: 05/27/2023]
3
Development and Application of an Integrated Management System for Off-Site Construction Projects. BUILDINGS 2022. [DOI: 10.3390/buildings12071063] [Citation(s) in RCA: 3] [Impact Index Per Article: 1.5] [Reference Citation Analysis] [Abstract] [Track Full Text] [Subscribe] [Scholar Register] [Indexed: 02/04/2023]
4
A Framework for Prefabricated Component Hoisting Management Systems Based on Digital Twin Technology. BUILDINGS 2022. [DOI: 10.3390/buildings12030276] [Citation(s) in RCA: 1] [Impact Index Per Article: 0.5] [Reference Citation Analysis] [Abstract] [Track Full Text] [Subscribe] [Scholar Register] [Indexed: 02/04/2023]
5
An Analysis on Promoting Prefabrication Implementation in Construction Industry towards Sustainability. INTERNATIONAL JOURNAL OF ENVIRONMENTAL RESEARCH AND PUBLIC HEALTH 2021;18:ijerph182111493. [PMID: 34770008 PMCID: PMC8583320 DOI: 10.3390/ijerph182111493] [Citation(s) in RCA: 5] [Impact Index Per Article: 1.7] [Reference Citation Analysis] [Abstract] [Key Words] [Track Full Text] [Download PDF] [Figures] [Subscribe] [Scholar Register] [Received: 09/06/2021] [Revised: 10/28/2021] [Accepted: 10/28/2021] [Indexed: 11/19/2022]
6
Intelligent Safety Assessment of Prestressed Steel Structures Based on Digital Twins. Symmetry (Basel) 2021. [DOI: 10.3390/sym13101927] [Citation(s) in RCA: 3] [Impact Index Per Article: 1.0] [Reference Citation Analysis] [Abstract] [Track Full Text] [Journal Information] [Subscribe] [Scholar Register] [Indexed: 12/12/2022]  Open
7
Intelligent Control Method of Hoisting Prefabricated Components Based on Internet-of-Things. SENSORS 2021;21:s21030980. [PMID: 33540530 PMCID: PMC7867203 DOI: 10.3390/s21030980] [Citation(s) in RCA: 4] [Impact Index Per Article: 1.3] [Reference Citation Analysis] [Abstract] [Key Words] [Track Full Text] [Download PDF] [Figures] [Subscribe] [Scholar Register] [Received: 12/30/2020] [Revised: 01/28/2021] [Accepted: 01/28/2021] [Indexed: 11/16/2022]
8
Application of Building Information Modelling (BIM) in the Health Monitoring and Maintenance Process: A Systematic Review. SENSORS 2021;21:s21030837. [PMID: 33513932 PMCID: PMC7866213 DOI: 10.3390/s21030837] [Citation(s) in RCA: 13] [Impact Index Per Article: 4.3] [Reference Citation Analysis] [Abstract] [Key Words] [Track Full Text] [Download PDF] [Figures] [Subscribe] [Scholar Register] [Received: 12/08/2020] [Revised: 01/22/2021] [Accepted: 01/23/2021] [Indexed: 11/17/2022]
9
Liu Z, Zhang A, Wang W. A Framework for an Indoor Safety Management System Based on Digital Twin. SENSORS 2020;20:s20205771. [PMID: 33053719 PMCID: PMC7601806 DOI: 10.3390/s20205771] [Citation(s) in RCA: 24] [Impact Index Per Article: 6.0] [Reference Citation Analysis] [Abstract] [Key Words] [MESH Headings] [Track Full Text] [Download PDF] [Figures] [Subscribe] [Scholar Register] [Received: 09/05/2020] [Revised: 09/24/2020] [Accepted: 10/09/2020] [Indexed: 11/16/2022]
10
Hou L, Tan Y, Luo W, Xu S, Mao C, Moon S. Towards a more extensive application of off-site construction: a technological review. INTERNATIONAL JOURNAL OF CONSTRUCTION MANAGEMENT 2020. [DOI: 10.1080/15623599.2020.1768463] [Citation(s) in RCA: 9] [Impact Index Per Article: 2.3] [Reference Citation Analysis] [Track Full Text] [Subscribe] [Scholar Register] [Indexed: 10/24/2022]
PrevPage 1 of 1 1Next
© 2004-2024 Baishideng Publishing Group Inc. All rights reserved. 7041 Koll Center Parkway, Suite 160, Pleasanton, CA 94566, USA