• Reference Citation Analysis
  • v
  • v
  • Find an Article
Find an Article PDF (4643727)   Today's Articles (3179)   Subscriber (50650)
For: Park J, Hwang E. A Two-Stage Multistep-Ahead Electricity Load ForecastingScheme Based on LightGBM and Attention-BiLSTM. Sensors (Basel) 2021;21:s21227697. [PMID: 34833791 PMCID: PMC8623363 DOI: 10.3390/s21227697] [Citation(s) in RCA: 4] [Impact Index Per Article: 1.3] [Reference Citation Analysis] [What about the content of this article? (0)] [Track Full Text] [Download PDF] [Figures] [Subscribe] [Scholar Register] [Received: 10/06/2021] [Revised: 11/13/2021] [Accepted: 11/17/2021] [Indexed: 11/23/2022]
Number Cited by Other Article(s)
1
Klaar ACR, Stefenon SF, Seman LO, Mariani VC, Coelho LDS. Optimized EWT-Seq2Seq-LSTM with Attention Mechanism to Insulators Fault Prediction. SENSORS (BASEL, SWITZERLAND) 2023;23:s23063202. [PMID: 36991913 PMCID: PMC10051368 DOI: 10.3390/s23063202] [Citation(s) in RCA: 6] [Impact Index Per Article: 6.0] [Reference Citation Analysis] [Abstract] [Key Words] [Track Full Text] [Subscribe] [Scholar Register] [Received: 02/23/2023] [Revised: 03/09/2023] [Accepted: 03/14/2023] [Indexed: 05/27/2023]
2
Lin L, Zhang J, Zhang N, Shi J, Chen C. Optimized LightGBM Power Fingerprint Identification Based on Entropy Features. ENTROPY (BASEL, SWITZERLAND) 2022;24:1558. [PMID: 36359649 PMCID: PMC9689363 DOI: 10.3390/e24111558] [Citation(s) in RCA: 2] [Impact Index Per Article: 1.0] [Reference Citation Analysis] [Abstract] [Key Words] [Track Full Text] [Figures] [Subscribe] [Scholar Register] [Received: 08/10/2022] [Revised: 10/25/2022] [Accepted: 10/27/2022] [Indexed: 06/16/2023]
3
Fernández-Martínez D, Jaramillo-Morán MA. Multi-Step Hourly Power Consumption Forecasting in a Healthcare Building with Recurrent Neural Networks and Empirical Mode Decomposition. SENSORS 2022;22:s22103664. [PMID: 35632071 PMCID: PMC9145418 DOI: 10.3390/s22103664] [Citation(s) in RCA: 2] [Impact Index Per Article: 1.0] [Reference Citation Analysis] [Abstract] [Key Words] [MESH Headings] [Track Full Text] [Download PDF] [Figures] [Subscribe] [Scholar Register] [Received: 04/08/2022] [Revised: 05/05/2022] [Accepted: 05/09/2022] [Indexed: 02/04/2023]
4
Interpretable Short-Term Electrical Load Forecasting Scheme Using Cubist. COMPUTATIONAL INTELLIGENCE AND NEUROSCIENCE 2022;2022:6892995. [PMID: 35178079 PMCID: PMC8847022 DOI: 10.1155/2022/6892995] [Citation(s) in RCA: 1] [Impact Index Per Article: 0.5] [Reference Citation Analysis] [Abstract] [Track Full Text] [Download PDF] [Figures] [Subscribe] [Scholar Register] [Received: 10/06/2021] [Revised: 12/16/2021] [Accepted: 01/03/2022] [Indexed: 01/17/2023]
PrevPage 1 of 1 1Next
© 2004-2024 Baishideng Publishing Group Inc. All rights reserved. 7041 Koll Center Parkway, Suite 160, Pleasanton, CA 94566, USA