1
|
Zhou W, Zhou P, Zheng Y, Xie Z. A Heuristic Integrated Scheduling Algorithm via Processing Characteristics of Various Machines. Symmetry (Basel) 2022. [DOI: 10.3390/sym14102150] [Citation(s) in RCA: 1] [Impact Index Per Article: 0.5] [Reference Citation Analysis] [Abstract] [Track Full Text] [Journal Information] [Subscribe] [Scholar Register] [Indexed: 03/29/2023] Open
Abstract
Complex products with a tree-like structure usually have an asymmetric structure. Therefore, in order to avoid the separation of equipment and operation correlation during the scheduling, the structural attributes of products and the use of equipment resources should be fully considered. However, this feature is ignored in the current research works on the scheduling of multi-variety and small batch products. This leads to increased idle time for equipment and an extended makespan for products. To avoid this situation, a heuristic integrated scheduling algorithm via processing characteristics of various machines (HIS-PCVM) is proposed. In the integrated scheduling, the algorithm first divides the equipment into two categories: the special equipment and the general equipment according to the resources of the production scheduling system. Then, different scheduling methods are designed according to the equipment categories. The makespan of the product is further optimized through various combination methods. Moreover, the constraint audit strategy to guarantee the constraint relationship between the operations is optimized. The earliest scheduling time strategy is proposed to improve the parallelism and serial tightness of the operations. These strategies reduce the idle time of equipment effectively. Experimental results show that the proposed algorithm has a better application effect in reducing the makespan of complex products, both with asymmetric structures and symmetric structures. This also shows that the algorithm is effective in improving the utilization rate of equipment.
Collapse
|
2
|
Application of Three Metaheuristic Algorithms to Time-Cost-Quality Trade-Off Project Scheduling Problem for Construction Projects Considering Time Value of Money. Symmetry (Basel) 2021. [DOI: 10.3390/sym13122402] [Citation(s) in RCA: 4] [Impact Index Per Article: 1.3] [Reference Citation Analysis] [Abstract] [Track Full Text] [Journal Information] [Subscribe] [Scholar Register] [Indexed: 01/17/2023] Open
Abstract
Time, cost, and quality have been known as the project iron triangles and substantial factors in construction projects. Several studies have been conducted on time-cost-quality trade-off problems so far, however, none of them has considered the time value of money. In this paper, a multi-objective mathematical programming model is developed for time-cost-quality trade-off scheduling problems in construction projects considering the time value of money, since the time value of money, which is decreased during a long period of time, is a very important matter. Three objective functions of time, cost, and quality are taken into consideration. The cost objective function includes holding cost and negative cash flows. In this model, the net present value (NPV) of negative cash flow is calculated considering the costs of non-renewable (consumable) and renewable resources in each time period of executing activities, which can be mentioned as the other contribution of this study. Then, three metaheuristic algorithms including multi-objective grey wolf optimizer (MOGWO), non-dominated sorting genetic algorithm (NSGA-II), and multi-objective particle swarm optimization (MOPSO) are applied, and their performance is evaluated using six metrics introduced in the literature. Finally, a bridge construction project is considered as a real case study. The findings show that considering the time value of money can prevent cost overrun in projects. Additionally, the results indicate that the MOGWO algorithm outperforms the NSGA-II and MOPSO algorithms.
Collapse
|
3
|
Abstract
This paper studies the production process of a shipbuilding enterprise. The company suffers from long manufacturing cycle, low utilization rate of personnel and an unbalanced production line. To solve these problems, the lean shipbuilding mode, mainly divided into shipbuilding work breakdown, production plan and virtual flow operation in this paper, is put forward, which combines the lean production and modern information management technology with shipbuilding. Supported by the theory of work breakdown structure and task package scheduling, the shipbuilding task package is reasonably divided. The priority of task package manufacturing is determined by calculating the task package manufacturing sequence coefficient, and a reasonable number of operators is calculated to ensure the continuity of segmented manufacturing. After determining the manufacturing priority of the task pack and the number of allocable personnel, the corresponding work can be scheduled. Production planning drives all production activities of the shipbuilding enterprise, and just-in-time production is achieved through the reasonable arrangement of these production plans, thus reducing the waste of personnel and time. Then, the virtual flow operation is carried out, which can achieve high efficiency of flow production and high flexibility of fixed workstation production during the production process of large-scale and heavy-duty products. The virtual assembly production system of the workshop is established according to the characteristics of shipbuilding operation and the actual production situation. On this basis, a lean shipbuilding manufacturing execution system for small and medium-sized shipbuilding enterprises is developed to achieve lean production in a shipbuilding workshop. Through the implementation of the lean shipbuilding mode based on task package scheduling and its manufacturing execution system, compared with the original data, the ship production cycle is reduced to 76.7%, the number of workers is reduced by 16.7% and the production balance rate is up to 81%.
Collapse
|
4
|
Research on Collaborative Order Decision-Making Method for Symmetric Participants in Complex Shipbuilding Projects. Symmetry (Basel) 2021. [DOI: 10.3390/sym13071305] [Citation(s) in RCA: 0] [Impact Index Per Article: 0] [Reference Citation Analysis] [Abstract] [Track Full Text] [Journal Information] [Subscribe] [Scholar Register] [Indexed: 11/17/2022] Open
Abstract
More extensive enterprise cooperation is an effective means to increase the competitiveness of shipbuilding companies in the current distributed manufacturing environment. Most cross-enterprise collaborative processes for shipbuilding projects have been widely concerned. However, the symmetry and cooperativity among the order decision-making process is rarely involved. A key issue for decision makers is to balance the interests of each symmetric participant and realize the consistent decision-making for the order. Existing order decision-making methods in the shipbuilding industry are low efficiency. The aim of this paper is to provide an assistant decision-making method to support effective order decision-making and multi-party cooperation for the multi-wining negotiation objectives. To solve this problem, a collaborative order decision-making framework based on decision support system (DSS) and multi-agent system (MAS) theory is presented, simulating the collaborative order decision-making process, and bridging the order decision-making with production scheduling. Then, a multi-stage negotiation method is provided to solve the distributed and symmetric order decision-making problem, and an illustrative example is conducted to demonstrate the effectiveness and rationality of the methods. Finally, an application case using a prototype system will be reported as a result.
Collapse
|
5
|
Symmetric Modeling of Diversification Strategy and Organizational Structure on Financial Performance: Evidence from China. Symmetry (Basel) 2021. [DOI: 10.3390/sym13020196] [Citation(s) in RCA: 0] [Impact Index Per Article: 0] [Reference Citation Analysis] [Abstract] [Track Full Text] [Journal Information] [Subscribe] [Scholar Register] [Indexed: 11/17/2022] Open
Abstract
Diversification is a strategy adopted by many enterprises in the process of expansion. The success of the diversification of an enterprise mainly depends on the choice and implement of strategy; choosing an organizational structure that fits the type of diversification strategy used is fundamental to improving financial performance. Based on the empirical research method, this study establishes a symmetric model of diversification strategy and organizational structure on financial performance and selects data from 613 A-share-listed companies in China, from 2012 to 2016, to test the impacts of unrelated and related diversification strategies on financial performance, as well as the moderating effects of united company, holding company, and multidivisional structures on such relationships. The results show that there is asymmetry between the diversification strategy adopted and financial performance, and a related diversification strategy should be adopted as a priority; the symmetry of an unrelated diversification strategy and holding company structure on financial performance is partially confirmed, and other elements should be adopted, simultaneously, to improve this symmetry; a related diversification strategy and multidivisional structure on financial performance is symmetric. The above findings will provide references for the diversification strategy choice and the organizational structure design of enterprises.
Collapse
|