1
|
Zhao L, Fu D, Wu X, Liu C, Yuan X, Wang S, Duan C. Opposite response of constructed wetland performance in nitrogen and phosphorus removal to short and long terms of operation. JOURNAL OF ENVIRONMENTAL MANAGEMENT 2024; 351:120002. [PMID: 38169257 DOI: 10.1016/j.jenvman.2023.120002] [Citation(s) in RCA: 0] [Impact Index Per Article: 0] [Reference Citation Analysis] [Abstract] [Key Words] [MESH Headings] [Track Full Text] [Subscribe] [Scholar Register] [Received: 10/12/2023] [Revised: 12/17/2023] [Accepted: 12/29/2023] [Indexed: 01/05/2024]
Abstract
Constructed wetlands (CWs) have been widely used for treating polluted water since the 1950s, with applications in over 50 countries worldwide. Most studies investigating the pollutant removal efficiency of these wetlands have focused on differences among wetland designs, operation strategies, and environmental conditions. However, there still remains a gap in understanding the variation in wetland pollutant removal efficiency over different time scales. Therefore, the main aim of the study is to address this gap by conducting a global meta-analysis to estimate the variation in nitrogen (N) and phosphorus (P) removal by wetland in short- and long-term pollutant treatment. The findings of this study indicated that the total efficiencies of N and P removal increased during short-term wetland operation but decreased during long-term operation. However, for surface flow CWs specifically, the efficiencies of N and P removal increased during short-term operation and remained stable during long-term operation. Moreover, the study discovered that wetland N removal efficiency was influenced by seasons, with an increase in spring and summer and a decrease in autumn and winter. Conversely, there was no significant seasonal effect on P removal efficiency. Additionally, high hydraulic load impaired wetland N and P removal efficiency during long-term operation. This study offers a critical review of the role of wetlands in wastewater treatment and provides valuable reference data for the design and selection of CWs types during wastewater treatment in the aspect of sustainability.
Collapse
Affiliation(s)
- Luoqi Zhao
- Yunnan Key Laboratory for Plateau Mountain Ecology and Restoration of Degraded Environments, School of Ecology and Environmental Sciences, Yunnan University, Kunming, 650091, China; Yunnan International Cooperative Center of Plateau Lake Ecological Restoration and Watershed Management & Yunnan Think Tank of Ecological Civilization, Kunming, Yunnan, 650091, China
| | - Denggao Fu
- Yunnan Key Laboratory for Plateau Mountain Ecology and Restoration of Degraded Environments, School of Ecology and Environmental Sciences, Yunnan University, Kunming, 650091, China; Yunnan International Cooperative Center of Plateau Lake Ecological Restoration and Watershed Management & Yunnan Think Tank of Ecological Civilization, Kunming, Yunnan, 650091, China
| | - Xiaoni Wu
- School of Agronomy and Life Sciences, Kunming University, Kunming, 650214, China
| | - Change Liu
- Yunnan Key Laboratory for Plateau Mountain Ecology and Restoration of Degraded Environments, School of Ecology and Environmental Sciences, Yunnan University, Kunming, 650091, China; Yunnan International Cooperative Center of Plateau Lake Ecological Restoration and Watershed Management & Yunnan Think Tank of Ecological Civilization, Kunming, Yunnan, 650091, China
| | - Xinqi Yuan
- Yunnan Key Laboratory for Plateau Mountain Ecology and Restoration of Degraded Environments, School of Ecology and Environmental Sciences, Yunnan University, Kunming, 650091, China; Yunnan International Cooperative Center of Plateau Lake Ecological Restoration and Watershed Management & Yunnan Think Tank of Ecological Civilization, Kunming, Yunnan, 650091, China
| | - Sichen Wang
- Yunnan Key Laboratory for Plateau Mountain Ecology and Restoration of Degraded Environments, School of Ecology and Environmental Sciences, Yunnan University, Kunming, 650091, China; Yunnan International Cooperative Center of Plateau Lake Ecological Restoration and Watershed Management & Yunnan Think Tank of Ecological Civilization, Kunming, Yunnan, 650091, China
| | - Changqun Duan
- Yunnan Key Laboratory for Plateau Mountain Ecology and Restoration of Degraded Environments, School of Ecology and Environmental Sciences, Yunnan University, Kunming, 650091, China; Yunnan International Cooperative Center of Plateau Lake Ecological Restoration and Watershed Management & Yunnan Think Tank of Ecological Civilization, Kunming, Yunnan, 650091, China.
| |
Collapse
|
2
|
Liu Y, Li Y, Yin W, Wang HC, Zhao X, Liu X, Lu S, Wang AJ. Long-term performance of a deep oxidation pond with horizontal subsurface flow constructed wetland for purification of rural polluted river water. ENVIRONMENTAL RESEARCH 2024; 240:117498. [PMID: 37884070 DOI: 10.1016/j.envres.2023.117498] [Citation(s) in RCA: 0] [Impact Index Per Article: 0] [Reference Citation Analysis] [Abstract] [Key Words] [MESH Headings] [Track Full Text] [Subscribe] [Scholar Register] [Received: 08/29/2023] [Revised: 10/07/2023] [Accepted: 10/23/2023] [Indexed: 10/28/2023]
Abstract
A full-scale deep oxidation pond with horizontal subsurface flow constructed wetland (DOP-HSCWs) was constructed and used to investigate the nutrient removal and establish a practical inversion prediction model. The high long-term performances of nearly 7 years were obtained with the average removal efficiencies of 76.48 ± 10.11% (chemical oxygen demand, COD), 60.61 ± 29.21% (ammonia nitrogen, NH4+-N), 54.04 ± 21.92% (total phosphorus, TP) and 88.44 ± 6.86% (suspended solids, SS), respectively. The removal efficiency actually increased after 2016 with outflow concentrations lower as compared to initial phase of operation. The effluent concentration in autumn were obviously higher than that in other seasons because of high influent loadings. The Flaml model achieved good performance demonstrating the ability to predict water quality of DOP-HSCWs without human intervention. In addition, COD, NH4+-N, TP concentration of effluent can be significantly affected by SS concentration of influent according to the generalized additive model (p < 0.001). Compared with HSCWs, the DOPs was mainly contributed to pollutant removal. In summer, Cyanobacteria, Cyanobacteria and Proteobacteria were dominated in DOPs, while Proteobacteria was dominated in winter. Although the relative abundance of Proteobacteria in anaerobic zone decreased by 14.99%, the relative abundance of Firmicutes and Chloroflexi increased by nearly 10%, which ensured decontamination effect of the DOPs. Proteobacteria was also dominated in HSCWs, but it was lower than that in DOPs. This study indicated that DOP-HSCWs can achieve a sustainably excellent purification of rural polluted river water during the long period of operation.
Collapse
Affiliation(s)
- Ying Liu
- State Key Laboratory of Environmental Criteria and Risk Assessment, National Engineering Laboratory for Lake Pollution Control and Ecological Restoration, Chinese Research Academy of Environmental Sciences, Beijing 100012, China; State Key Laboratory of Urban Water Resource and Environment, School of Environment, Harbin Institute of Technology, Harbin 150090, China
| | - Yongtian Li
- School of Environmental Science and Engineering, Tianjin University, Tianjin 300000, China; Environmental Protection Research Institute, Qinhuangdao 066000, China
| | - Wanxin Yin
- College of the Environment, Liaoning University, Shenyang 110036, China
| | - Hong-Cheng Wang
- State Key Laboratory of Urban Water Resource and Environment, School of Civil and Environmental Engineering, Harbin Institute of Technology Shenzhen, Shenzhen 518055, China
| | - Xingjuan Zhao
- Beijing Rural Development Center, Beijing Municipal Bureau of Agriculture and Rural Affairs, Beijing 100101, China
| | - Xiaohui Liu
- College of Environmental Science and Engineering, Ocean University of China, Qingdao 266100, China.
| | - Shaoyong Lu
- State Key Laboratory of Environmental Criteria and Risk Assessment, National Engineering Laboratory for Lake Pollution Control and Ecological Restoration, Chinese Research Academy of Environmental Sciences, Beijing 100012, China.
| | - Ai-Jie Wang
- State Key Laboratory of Urban Water Resource and Environment, School of Environment, Harbin Institute of Technology, Harbin 150090, China; State Key Laboratory of Urban Water Resource and Environment, School of Civil and Environmental Engineering, Harbin Institute of Technology Shenzhen, Shenzhen 518055, China
| |
Collapse
|
3
|
A D, Deng YY, Guo QM, Jiang Y, Chen CX. A three-year study on the treatment of domestic-industrial mixed wastewater using a full-scale hybrid constructed wetland. ENVIRONMENTAL SCIENCE AND POLLUTION RESEARCH INTERNATIONAL 2023; 30:31256-31267. [PMID: 36445519 DOI: 10.1007/s11356-022-23936-3] [Citation(s) in RCA: 0] [Impact Index Per Article: 0] [Reference Citation Analysis] [Abstract] [Key Words] [MESH Headings] [Track Full Text] [Subscribe] [Scholar Register] [Received: 04/13/2022] [Accepted: 10/27/2022] [Indexed: 06/16/2023]
Abstract
Three full-scale constructed wetlands (CWs), namely vertical flow (VFCW), surface flow (SFCW), and horizontal flow (HFCW) systems, were combined in a series process to form a hybrid CW, which was used for the treatment performance of domestic-industrial mixed wastewater and investigated over a three-year period. The hybrid CW demonstrated that it is effective and stable during the long-term treatment of high-loading mixed wastewater under different operation years, season changes, and technology processes, with the average removal efficiencies of suspended solids, chemical oxygen demand, biological oxygen demand, total nitrogen, ammonia nitrogen, nitrate nitrogen, and total phosphorous being 84, 40, 54, 54, 70, 40, and 46%, respectively. The effluent quality of the hybrid CW reached the highest discharge standard for wastewater treatment plants. First, a variety of pollutants from the mixed wastewater were effectively removed in the subsurface processes (VFCW and HFCW) via substrate adsorption and degradation of the attached biofilm. The higher dissolved oxygen content and oxygen transfer capacity values in the VFCW were favourable for the occurrence of aerobic pathways (such as nitrification and inorganic phosphorus oxidation). In addition, with the large consumption of oxygen in the previous process, the oxygen-enriching capacity of the SFCW processes, provided aerobic potential for the next stage. In particular, the plant debris in the SFCW temporarily increased the organics and suspended solids, further increasing the C/N ratio, which was beneficial for denitrification as the main nitrogen removal pathway in the HFCW.
Collapse
Affiliation(s)
- Dan A
- Engineering and Technology Research Center for Agricultural Land Pollution Integrated Prevention and Control of Guangdong Higher Education Institute, College of Resources and Environment, Zhongkai University of Agriculture and Engineering, Guangzhou, 510225, China
| | - Yang-Yang Deng
- Engineering and Technology Research Center for Agricultural Land Pollution Integrated Prevention and Control of Guangdong Higher Education Institute, College of Resources and Environment, Zhongkai University of Agriculture and Engineering, Guangzhou, 510225, China
| | - Qin-Mei Guo
- Engineering and Technology Research Center for Agricultural Land Pollution Integrated Prevention and Control of Guangdong Higher Education Institute, College of Resources and Environment, Zhongkai University of Agriculture and Engineering, Guangzhou, 510225, China
| | - Yu Jiang
- Engineering and Technology Research Center for Agricultural Land Pollution Integrated Prevention and Control of Guangdong Higher Education Institute, College of Resources and Environment, Zhongkai University of Agriculture and Engineering, Guangzhou, 510225, China
| | - Chun-Xing Chen
- Shenzhen Academy of Environmental Sciences, Shenzhen, 518001, China.
- State Environmental Protection Key Laboratory of Drinking Water Source Management and Technology, Shenzhen, 518001, China.
| |
Collapse
|
4
|
Li L, Zhang J, Lu S, Lu H, Du Z, Bi B, Cao F, Kong W. Performance of wetland applied to ecological remediation of abandoned fish ponds: A case study in Gonghu Bay, Tai lake. CHEMOSPHERE 2023; 316:137698. [PMID: 36587912 DOI: 10.1016/j.chemosphere.2022.137698] [Citation(s) in RCA: 2] [Impact Index Per Article: 1.0] [Reference Citation Analysis] [Abstract] [Key Words] [MESH Headings] [Track Full Text] [Subscribe] [Scholar Register] [Received: 10/15/2021] [Revised: 12/16/2022] [Accepted: 12/28/2022] [Indexed: 06/17/2023]
Abstract
To restore the abandoned fish ponds to "near natural" state, the wetland restoration was carried out in Gonghu Bay lakeside, and its long-term performance of controlling external load was studied for 5 years. The findings showed that water quality and biodiversity had been improved dramatically after the preliminary transformation. The concentrations of permanganate index (CODMn), total nitrogen (TN), and total phosphorus (TP) obviously decreased from 12.91 mg L-1 to 4.32 mg L-1, from 3.46 mg L-1 to 1.42 mg L-1, and from 0.27 mg L-1 to 0.04 mg L-1, respectively. The proportion of Cyanophyta was effectively reduced from 31.82% to 18.89%, and favored the growth of diatoms (31.82%-37.78%) to be the dominant algae species. Aquatic plant species and coverage gradually increased from 16 to 56 and from 5% to 60%, respectively. An in-deep monitoring done for 5 years (2013-2017) showed that the wetland achieved a satisfactory removal efficiency of 58.95% for TN, 64.60% for TP, and up to 77.83% for chlorophyll-a. Besides, three pollution scenarios, such as stormwater runoff, algal bloom, and continuous water transfer, were selected to explore the tolerance of the wetland to the suddenly increased pollution loads. The results dedicated that even if the inlet load was up to 1.0 × 105 m3 d-1, the removal rate coefficients of wetland for chlorophyll-a, TP, and TN were 0.135-0.239 d-1, 0.041-0.112 d-1, and 0.030-0.109 d-1, respectively, which were equivalent to the well-running wetlands. This study confirmed that the wetland was not only a promising ecological remediation technique to contaminated abandoned fish ponds, but also could withstand high pollution load, which had the prospect of sustainable utilization.
Collapse
Affiliation(s)
- Linlin Li
- State Key Laboratory of Environmental Criteria and Risk Assessment, State Environmental Protection Key Laboratory for Lake Pollution Control, National Engineering Laboratory for Lake Pollution Control and Ecological Restoration, State Environmental Protection Scientific Observation and Research Station for Lake Dongtinghu (SEPSORSLD), Chinese Research Academy of Environmental Sciences, Beijing, 100012, PR China; College of Water Science, Beijing Normal University, Beijing, 100875, PR China
| | - Jing Zhang
- State Key Laboratory of Environmental Criteria and Risk Assessment, State Environmental Protection Key Laboratory for Lake Pollution Control, National Engineering Laboratory for Lake Pollution Control and Ecological Restoration, State Environmental Protection Scientific Observation and Research Station for Lake Dongtinghu (SEPSORSLD), Chinese Research Academy of Environmental Sciences, Beijing, 100012, PR China
| | - Shaoyong Lu
- State Key Laboratory of Environmental Criteria and Risk Assessment, State Environmental Protection Key Laboratory for Lake Pollution Control, National Engineering Laboratory for Lake Pollution Control and Ecological Restoration, State Environmental Protection Scientific Observation and Research Station for Lake Dongtinghu (SEPSORSLD), Chinese Research Academy of Environmental Sciences, Beijing, 100012, PR China; College of Water Science, Beijing Normal University, Beijing, 100875, PR China.
| | - Hongbin Lu
- State Key Laboratory of Environmental Criteria and Risk Assessment, State Environmental Protection Key Laboratory for Lake Pollution Control, National Engineering Laboratory for Lake Pollution Control and Ecological Restoration, State Environmental Protection Scientific Observation and Research Station for Lake Dongtinghu (SEPSORSLD), Chinese Research Academy of Environmental Sciences, Beijing, 100012, PR China; College of Water Science, Beijing Normal University, Beijing, 100875, PR China
| | - Zhichao Du
- State Key Laboratory of Environmental Criteria and Risk Assessment, State Environmental Protection Key Laboratory for Lake Pollution Control, National Engineering Laboratory for Lake Pollution Control and Ecological Restoration, State Environmental Protection Scientific Observation and Research Station for Lake Dongtinghu (SEPSORSLD), Chinese Research Academy of Environmental Sciences, Beijing, 100012, PR China; School of Civil Engineering, Liaoning Engineering Technology University, Shenyang, 123000, PR China
| | - Bin Bi
- State Key Laboratory of Environmental Criteria and Risk Assessment, State Environmental Protection Key Laboratory for Lake Pollution Control, National Engineering Laboratory for Lake Pollution Control and Ecological Restoration, State Environmental Protection Scientific Observation and Research Station for Lake Dongtinghu (SEPSORSLD), Chinese Research Academy of Environmental Sciences, Beijing, 100012, PR China
| | - Fengmei Cao
- College of Engineering, China Agricultural University, Beijing, 100083, PR China
| | - Weijing Kong
- State Key Laboratory of Environmental Criteria and Risk Assessment, State Environmental Protection Key Laboratory for Lake Pollution Control, National Engineering Laboratory for Lake Pollution Control and Ecological Restoration, State Environmental Protection Scientific Observation and Research Station for Lake Dongtinghu (SEPSORSLD), Chinese Research Academy of Environmental Sciences, Beijing, 100012, PR China.
| |
Collapse
|
5
|
Huang L, Bao J, Zhao F, Liang Y, Chen Y. New insight for purifying polluted river water using the combination of large-scale rotating biological contactors and integrated constructed wetlands in the cold season. JOURNAL OF ENVIRONMENTAL MANAGEMENT 2022; 324:116433. [PMID: 36352732 DOI: 10.1016/j.jenvman.2022.116433] [Citation(s) in RCA: 1] [Impact Index Per Article: 0.3] [Reference Citation Analysis] [Abstract] [Key Words] [MESH Headings] [Track Full Text] [Subscribe] [Scholar Register] [Received: 07/29/2022] [Revised: 09/19/2022] [Accepted: 10/02/2022] [Indexed: 06/16/2023]
Abstract
Ecological treatment technologies, applied to deal with polluted river water in the low temperature season, remain limited. In this study, a new insight was put forward for purifying polluted river water using a combination system (CS) of large-scale rotating biological contactors (RBCs) and integrated constructed wetlands in autumn and winter. The treatment performance, average removal contribution (RC), nitrification and denitrification rates, microbial community structure, and ecosystem service value were considered to estimate the combination system. Results revealed that the average removal efficiencies of ammonium (NH4+-N), total nitrogen (TN), total phosphorus (TP), and chemical oxygen demand (COD) reached 93.9%, 20.8%, 36.5%, and 37.1%, respectively. The combination system showed excellent removal efficiency of NH4+-N regardless of the effect of low temperature. The maximum values of nitrification and denitrification rates were 59.57 g N/(m3·d) and 0.78 g N/(m2·d), respectively. Considerable differences in bacterial community diversity, richness and relative abundance of functional microbes were observed in the main treatment units, resulting in different average RC to pollutants. The unit capital cost of CS purifying polluted river water was 260 USD/m3 and the operation and maintenance cost was 0.144 million USD/yr. Meanwhile, the ecosystem service value of the CS was 0.334 million USD in autumn and winter. CS not only possessed excellent pollutant purifying efficiencies, but also achieved high ecological service value in the cold season.
Collapse
Affiliation(s)
- Lei Huang
- Key Laboratory of the Three Gorges Reservoir Region's Eco-Environment (Ministry of Education), College of Resources and Environment, Southwest University, Chongqing, 400715, China; Chongqing Key Laboratory of Agricultural Resources and Environment, Chongqing, 400716, China.
| | - Jun'an Bao
- Key Laboratory of the Three Gorges Reservoir Region's Eco-Environment (Ministry of Education), College of Resources and Environment, Southwest University, Chongqing, 400715, China
| | - Fang Zhao
- Key Laboratory of the Three Gorges Reservoir Region's Eco-Environment (Ministry of Education), College of Resources and Environment, Southwest University, Chongqing, 400715, China
| | - Yinkun Liang
- Key Laboratory of the Three Gorges Reservoir Region's Eco-Environment (Ministry of Education), College of Resources and Environment, Southwest University, Chongqing, 400715, China
| | - Yucheng Chen
- Key Laboratory of the Three Gorges Reservoir Region's Eco-Environment (Ministry of Education), College of Resources and Environment, Southwest University, Chongqing, 400715, China; Chongqing Key Laboratory of Agricultural Resources and Environment, Chongqing, 400716, China.
| |
Collapse
|
6
|
Wang T, Xiao L, Lu H, Lu S, Li J, Guo X, Zhao X. Nitrogen removal from summer to winter in a field pilot-scale multistage constructed wetland-pond system. J Environ Sci (China) 2022; 111:249-262. [PMID: 34949355 DOI: 10.1016/j.jes.2021.03.028] [Citation(s) in RCA: 2] [Impact Index Per Article: 0.7] [Reference Citation Analysis] [Abstract] [Key Words] [MESH Headings] [Track Full Text] [Journal Information] [Subscribe] [Scholar Register] [Received: 12/28/2020] [Revised: 03/11/2021] [Accepted: 03/11/2021] [Indexed: 06/14/2023]
Abstract
A pilot-scale multistage constructed wetland-pond (MCWP) system with a "pre-ecological oxidation pond, two-stage horizontal subsurface flow constructed wetland (HSCW) and surface flow constructed wetland (SFCW) as the core and postsubmerged plant pond" as the process was used to treat actual polluted river water in the field, and the variation in nitrogen removal from summer to winter was investigated. The results showed that the average total nitrogen (TN) removal efficiency in the MCWP was approximately 40.74%. The significant positive correlation between the daily highest temperature and the TN removal efficiency of the whole system was fitted with a nonlinear curve (R2 = 0.7192). The TN removal load rate in the HSCWs was 2.7-3.7 times that in the SFCW. The SFCW, which had high-density plants (35 plants/m2), increased the proportion of nitrogen removed by plant harvesting and microbial function. The TN transformed by Iris pseudacorus L. accounted for 54.53% in the SFCW. Furthermore, bacteria completed the nitrogen cycle in the SFCW through a variety of nitrogen removal pathways. This research not only investigated the TN removal performance in an MCWP system but also made it possible to predict the TN removal efficiency according to the daily highest temperature from summer to winter in the field.
Collapse
Affiliation(s)
- Tao Wang
- National Engineering Laboratory for Lake Pollution Control and Ecological Restoration, State Environmental Protection Scientific Observation and Research Station for Lake Dongtinghu (SEPSORSLD), State Environmental Protection Key Laboratory for Lake Pollution Control, State Key Laboratory of Environmental Criteria and Risk Assessment, Chinese Research Academy of Environmental Sciences, Beijing 100012, China; College of Environmental Science and Engineering, Liaoning Technical University, Fuxin 123000, China
| | - Liping Xiao
- School of Environmental and Municipal Engineering, Qingdao University of Technology, Qingdao 266033, China
| | - Hongbin Lu
- National Engineering Laboratory for Lake Pollution Control and Ecological Restoration, State Environmental Protection Scientific Observation and Research Station for Lake Dongtinghu (SEPSORSLD), State Environmental Protection Key Laboratory for Lake Pollution Control, State Key Laboratory of Environmental Criteria and Risk Assessment, Chinese Research Academy of Environmental Sciences, Beijing 100012, China; College of Water Sciences, Beijing Normal University, Beijing 100875, China.
| | - Shaoyong Lu
- National Engineering Laboratory for Lake Pollution Control and Ecological Restoration, State Environmental Protection Scientific Observation and Research Station for Lake Dongtinghu (SEPSORSLD), State Environmental Protection Key Laboratory for Lake Pollution Control, State Key Laboratory of Environmental Criteria and Risk Assessment, Chinese Research Academy of Environmental Sciences, Beijing 100012, China.
| | - Jiaxin Li
- National Engineering Laboratory for Lake Pollution Control and Ecological Restoration, State Environmental Protection Scientific Observation and Research Station for Lake Dongtinghu (SEPSORSLD), State Environmental Protection Key Laboratory for Lake Pollution Control, State Key Laboratory of Environmental Criteria and Risk Assessment, Chinese Research Academy of Environmental Sciences, Beijing 100012, China
| | - Xiaochun Guo
- National Engineering Laboratory for Lake Pollution Control and Ecological Restoration, State Environmental Protection Scientific Observation and Research Station for Lake Dongtinghu (SEPSORSLD), State Environmental Protection Key Laboratory for Lake Pollution Control, State Key Laboratory of Environmental Criteria and Risk Assessment, Chinese Research Academy of Environmental Sciences, Beijing 100012, China
| | - Xiaoliang Zhao
- College of Environmental Science and Engineering, Liaoning Technical University, Fuxin 123000, China
| |
Collapse
|
7
|
Li Y, Nuamah LA, Pu Y, Zhang H, Norgbey E, Nwankwegu AS, Banahene P, Bofah R. A radial basis function neural network based multi-objective optimization for simultaneously enhanced nitrogen and phosphorus removal in a full-scale integrated surface flow treatment wetland-pond system. BIORESOURCE TECHNOLOGY 2022; 344:126336. [PMID: 34785331 DOI: 10.1016/j.biortech.2021.126336] [Citation(s) in RCA: 0] [Impact Index Per Article: 0] [Reference Citation Analysis] [Abstract] [Key Words] [MESH Headings] [Track Full Text] [Subscribe] [Scholar Register] [Received: 09/13/2021] [Revised: 11/07/2021] [Accepted: 11/09/2021] [Indexed: 06/13/2023]
Abstract
In this study, a radial basis function neural network (RBFNN) model was developed and implemented in a multi-objective optimization procedure to determine the optimal hydraulic loading rate (HLR), hydraulic retention time (HRT), and mass loading rates (MLR) for enhanced removal of nitrogen and phosphorus by an integrated surface flow treatment wetland-pond system treating drinking source water in Yancheng, China. Prior to modelling, the system's 6-year nitrogen and phosphorus removal efficiencies were found to trend downwards as effluent concentrations trended positively. Meanwhile, operating parameter interaction effects impacted final effluent quality. Thus, total nitrogen and total phosphorus removal were simulated by an RBFNN model with satisfactory R2 of 0.99 and 0.98 respectively. Optimal average HLR, HRT and MLR for 80% simultaneous removal efficiencies were subsequently determined to be 0.10860 ± 0.03 md-1, 30.43 ± 9.96 d and 306.416 ± 89.54 mgm-2d-1 respectively. The results highlight the feasibility of the RBFNN modelling based optimization procedure for treatment wetlands.
Collapse
Affiliation(s)
- Yiping Li
- College of Environment, Hohai University, Nanjing 210098, PR China
| | - Linda A Nuamah
- College of Environment, Hohai University, Nanjing 210098, PR China.
| | - Yashuai Pu
- College of Environment, Hohai University, Nanjing 210098, PR China
| | - Haikuo Zhang
- College of Environment, Hohai University, Nanjing 210098, PR China
| | - Eyram Norgbey
- College of Environment, Hohai University, Nanjing 210098, PR China
| | | | - Patrick Banahene
- College of Environment, Hohai University, Nanjing 210098, PR China
| | - Robert Bofah
- College of Environment, Hohai University, Nanjing 210098, PR China
| |
Collapse
|
8
|
Effect of the Influent Substrate Concentration on Nitrogen Removal from Summer to Winter in Field Pilot-Scale Multistage Constructed Wetland–Pond Systems for Treating Low-C/N River Water. SUSTAINABILITY 2021. [DOI: 10.3390/su132212456] [Citation(s) in RCA: 4] [Impact Index Per Article: 1.0] [Reference Citation Analysis] [Abstract] [Track Full Text] [Subscribe] [Scholar Register] [Indexed: 11/16/2022]
Abstract
The quality of micropolluted water is unstable and its substrate concentration fluctuates greatly. The goal is to predict the concentration effect on the treatment of nitrogen in a river with an actual low C/N ratio for the proposed full-scale Xiaoyi River estuary wetland, so that the wetland project can operate stably and perform the water purification function effectively in the long term. Two pilot-scale multistage constructed wetland–pond (MCWP) systems (S1 and S2, respectively) based on actual engineering with the same “front ecological oxidation ponds, two-stage horizontal subsurface flow constructed wetlands and surface flow constructed wetlands (SFCWs) as the core and postsubmerged plant ponds” as the planned process were constructed to investigate the effect of different influent permanganate indexes (CODMn) and total nitrogen (TN) contents on nitrogen removal from micropolluted river water with a fixed C/N ratio from summer to winter in the field. The results indicate that the TN removal rate in the S1 and S2 systems was significant (19.56% and 34.84%, respectively). During the process of treating this micropolluted water with a fixed C/N ratio, the influent of S2 with a higher CODMn concentration was conducive to the removal of TN. The TN removal rate in S2 was significantly affected by the daily highest temperature. There was significant nitrogen removal efficiency in the SFCWs. The C/N ratio was a major determinant influencing the nitrogen removal rate in the SFCWs. The organic matter release phenomenon in SFCWs with high-density planting played an essential role in alleviating the lack of carbon sources in the influent. This research strongly supports the rule that there is seasonal nitrogen removal in the MCWPs under different influent substrate concentrations, which is of guiding significance for practical engineering.
Collapse
|
9
|
Keng TS, Samsudin MFR, Sufian S. Evaluation of wastewater treatment performance to a field-scale constructed wetland system at clogged condition: A case study of ammonia manufacturing plant. THE SCIENCE OF THE TOTAL ENVIRONMENT 2021; 759:143489. [PMID: 33248782 DOI: 10.1016/j.scitotenv.2020.143489] [Citation(s) in RCA: 0] [Impact Index Per Article: 0] [Reference Citation Analysis] [Abstract] [Key Words] [Track Full Text] [Subscribe] [Scholar Register] [Received: 06/16/2020] [Revised: 10/02/2020] [Accepted: 10/28/2020] [Indexed: 06/12/2023]
Abstract
Assessment of the treatment performance in the field-scale hybrid constructed wetland (CW) for ammonia manufacturing plant remains limited. After being in operations running on and off since 2014, the hybrid CW which treats effluent from the ammonia manufacturing plant in Peninsular, Malaysia has recently demonstrated the full clogging to the CW. It takes only 8 months to demonstrate a big deterioration of performance in 2019. Though the mechanism of clogging is not clear, which can be partially from inherent design problems or operational issues, nonetheless, it is important to evaluate how this clogging has impacted the effluent treatment performance and the continuous utilization of the CW. The purpose of this study is to evaluate the impact of the treatment performance on the ammoniacal nitrogen and COD removal when the CW is clogged. The result revealed that there is no impact on COD removal, but it has a substantial impact on the ammoniacal nitrogen removal. The ammoniacal nitrogen removal dropped to negative (outlet concentration is higher than inlet concentration) during the clogged period. Another observation is, the low removal rate also coincides with a high COD/N ratio, when the COD/N ratio increased to >2, the ammoniacal nitrogen removal rate dropped substantially, with the coefficient of determination, R2 of 40.5%. The root cause for the clogging to develop in a short period of time is unidentified. However, it is still worth noting that COD and ammoniacal nitrogen efficiency did not behave the same at the clogged CW.
Collapse
Affiliation(s)
- Tan Sew Keng
- Chemical Engineering Department, Universiti Teknologi PETRONAS, 32610 Bandar Seri Iskandar, Perak, Malaysia
| | | | - Suriati Sufian
- Chemical Engineering Department, Universiti Teknologi PETRONAS, 32610 Bandar Seri Iskandar, Perak, Malaysia.
| |
Collapse
|